The perspective drawings have been done for this upgrade. (See link below)
Listed is the costings we are working on-
Floors
- Repair of existing timber floor- sanding and finishing (127m2)
Walls
- Repainting of existing walls (150m2)
- Painting of walls cross bracing, columns & beams (35m2)
Ceilings
- Replacing 2 damaged ceiling boards (2pcs)
- Painting of ceilings (140m2)
- Installing sound absorbing panels on ceiling (e.g 50mm Quietspace) (46m2)
Wall Coverings
- Installing acoustic panels on walls (10m2)
- Covering existing announcement boards with sound absorption titles and secure fixing of the boards on the walls.(10m2)
- Replacing existing wall mirrors (14m2)
- Replacing curtain covering the wall mirrors (including curtain track) (14m2)
- Installing a new curtain rail (6.4m)
- Cleaning of existing black curtain and installing a new curtain rail (Lumpsum)
Entry Door
- Repairing/replacing existing door push bar (1pc)
Heating & Airconditioning
- Installing a heating & Airconditioning system (Lumpsum)
Dance Barres
- Installing new dance barres (double rails) (22.1m)
Sound System
- Installing a new sound system (Lumpsum)
Link - 3D perspective
https://api2.enscape3d.com/v3/view/2b6616a6-e9a6-49d4-885d-72508627ae88
Now that you can see what we are trying to achieve, we need quite a sum to make it all happen.
Come on Hamilton Community - Let's do this together.