Back to page

Returning Ja 1260 to Steam!

  • Steam Dome Top Removed

      23 June 2016
    Posted by: Stefan van Vliet
    Main image

    In order to keep things moving, the steam dome top has been removed to allow for investigation into the regulator, this is known to have a slight leak which will need to be rectified before the boiler can be hydraulically tested.

      0 comments  |  Login to leave a comment
  • Tube Removal Begins

      16 April 2016
    Posted by: Stefan van Vliet
    Main image

    April 2016:

    We've started removing tubes from Ja 1260, 1/4 of the total to be removed were cut off from the firebox end today ready for pulling once all are ready to come out.

      0 comments  |  Login to leave a comment