Almost There
5 February 2018Well we managed to get most of the way there before leaving Nepal last year. It was an intensive three weeks work, where we achieved a lot, however with some serious logistical and supply issues we didn't quite make it.
The roof is on, but the kitchen, wiring, lighing, plumbing, exterior plastering and windows still need to be done. Although we have let most of the materials on site for the interior works, installation work still needs to be funded along with the work to the exterior to make the building weather tight.
Your generous donations have got us this far however we are now on the final push for funds so that we can get this exciting project 100% complete.