Installation - Stage 1
18 August 2015The Trust is thrilled to announce the details of Stage 1 of our Wurlitzer Pipe Organ installation in the Playhouse Theatre, Glen Eden. Stage 1 involves;
• Building the percussion chamber at the left back of the stage
• Building the organ pit, front right of stage
• Installation of a new console lift in the organ pit
• Removal of part of the wall back stage to install the swell shutters (those are the vertical louvre like structures that let the sound out of the organ chamber and control the volume.
0 comments
|
Login to leave a comment