Back to page

Aileen Downey Dance Studio

Looking Good

  13 December 2019
Main image

The perspective drawings have been done for this upgrade. (See link below)

Listed is the costings we are working on-

Floors

- Repair of existing timber floor- sanding and finishing (127m2)

Walls

- Repainting of existing walls (150m2)

- Painting of walls cross bracing, columns & beams (35m2)

Ceilings

- Replacing 2 damaged ceiling boards (2pcs)

- Painting of ceilings (140m2)

- Installing sound absorbing panels on ceiling (e.g 50mm Quietspace) (46m2)

Wall Coverings

- Installing acoustic panels on walls (10m2)

- Covering existing announcement boards with sound absorption titles and secure fixing of the boards on the walls.(10m2)

- Replacing existing wall mirrors (14m2)

- Replacing curtain covering the wall mirrors (including curtain track) (14m2)

- Installing a new curtain rail (6.4m)

- Cleaning of existing black curtain and installing a new curtain rail (Lumpsum)

Entry Door

- Repairing/replacing existing door push bar (1pc)

Heating & Airconditioning

- Installing a heating & Airconditioning system (Lumpsum)

Dance Barres

- Installing new dance barres (double rails) (22.1m)

Sound System

- Installing a new sound system (Lumpsum)

Link - 3D perspective

https://api2.enscape3d.com/v3/view/2b6616a6-e9a6-49d4-885d-72508627ae88

Now that you can see what we are trying to achieve, we need quite a sum to make it all happen.

Come on Hamilton Community - Let's do this together.

  0 comments  |  Login to leave a comment
Read 6 more updates