Work in progress
30 September 2020The dividing wall complete. Wiring in place ready for termination. Wall linings gib purchased and in progress. Stove, extractor, ducting, commercial sinkbench, handwash basin all purchased ready to install. Waiting on the plumber to install water and waste before the sink wall can be lined. The quote for waterproof vinyl flooring was terrifying $1,212.50 but needs must.