Back to page

Help us bring Stella home

  • Work progressing

      5 September 2025

    Work is progressing on getting power, water and drainage to the raptor facility. Trenches have been dug to run power cables and water pipes, a hole for our waste water pump and a pad for the tank.

    Photos posted on page for you to view.

      0 comments  |  Login to leave a comment