Day 12 Sounds 2 Sounds
18 March 2024Final push to the finish. A little worried about the tour bus traffic on route. Left Te Anau at 7am really nice ride out if town. Bus traffic pretty good and JUST enough road should to avoid being part of the paint work. A consistent 105k climb to the Homer Tunnel. Steep ramps in places seemed vertical, with the last 1k to tunnel a real battle exhausted legs didn't have much left to give there. Through the tunnel for the down hill roll out to the finish line.
What a course. Really hard, massive climbs, remote country to ride through. A very special event to be part off. Thank you for your support along the way.