Update for 26/06/2014
26 June 2014Work on the frame and engine are nearing an end. The frame is in John Pitcornfs workshop in Te Kuiti. John and Murray continue to progress the restoration of the frame, engine and bogies. The engine overhaul is now completed, with the following tasks completed: 1. Reassembled the complete engine unit 2. New crossheads, pistons, and piston rings have been cast and machined 3. Crosshead guides bored 4. Cylinders bored 5. Valve faces machined 6. All crankshaft and transverse shaft bearings remetalled and fitted John and Murrayfs workmanship is top quality, and we are looking forward to having the loco operational.
-